Factory Wholesale Industrial Transparent Epoxy Sealing Primer Floor Coating Paint
Product introduction
Key attributes
Industry-specific attributes
Other attributes
Main Raw Material:Epoxy
Usage:Boat Paint, Building Coating, Furniture Paint, Road Marking Paint
Other Names:Floor Paint
MF:Mixture
EINECS No.:Mixture
Application Method:Roll Coating/Brush Coating
State:Liquid Coating
Brand Name:MIT-IVY
Model Number:TL-701AB-2
Appearance:Liquid Viscous Paint
Advantage:Eviromental Friendly
Color:Transparent
Shelf life:1 Year
Package:25 Kg/ Barrel
MOQ:500kg
Effect:Smooth Surface
Packaging and delivery:Packaging Details
Lead time
Quantity (kilograms) | 1 - 1000 | > 1000 |
Lead time (days) | 7 | To be negotiated |
Methods of application
The first step is to apply MyCover as a primer sealer so that later MySealant 2K, as a two-component water-based polyurethane varnish, creates the perfect protective film. You must wait 4 hours after the application of MyCover.
MySealant 2K is applied on the microcement coating in two layers and the drying time between layers is from 8 to 24 hours, depending on environmental conditions and taking into account that humidity delays drying. After the first layer, the surface should be sanded with a 400 grit sander, while the final layer does not require any sanding.
It should not be applied in environments with a temperature that is below 15ºC and for optimal results it is advisable to apply it at temperatures ranging between 18 and 24ºC. The polyurethane varnish can be applied with a fiber roller or gun.
Advantages
1.Very low VOC levels (Volatile Organic Compounds), being less aggresive to the environment and the painter
2.Provides highs resistance to corrosion with over 400 hours in salt spray and humid chamber tests
Construction description
Ingredients A, B two components
Mixing ratio 3:1 (weight ratio)
Mixing method: Mix component A thoroughly, add component B and continue mixing until smooth.
Coating thickness Dry film thickness 20 μ m
Wet film thickness 50 μ m
Maturing period (25℃) 10-15min
Service period (25°C) 3h
Re-coating interval 12h minimum 4Bh maximum
Maintenance
When directly applied on the surface of the primer, the primer shall be polished, clean, dry, free of rust and oil stains. When coated on the surface of the primer, the primer surface should be clean, dry and free of dirt.
Use conditions Construction temperature 10-35 ℃, mixing degree 30-75%, good ventilation conditions.
Notes
- Do not clean the surface with chemical products or cleaners that contain abrasive substances. The use of bleach and detergents is especially contraindicated.
- Clean the coating with water and MyCleaner or neutral soap
- Do not cover the microcement sealant until two weeks have passed since the application
- Before wetting it, it is necessary to let the polyurethane varnish dry for at least one week. Keep in mind that the fullness of its chemical properties is achieved after two weeks.
Recommended Paint System | 2 coats of Maydos transparent putty for patching imperfection |
1 coat of Maydos water-based wood varnish primer | |
2 coats of Maydos water-based wood finish | |
Clean up: Clean all equipment with clean water immediately after use | |
Storage:Store in cool(temperature range 5℃-45℃), dry and well-ventilated place and keep it out ofthe reach of children | |
Preparation and Application | 1. Before application, stir the paint completely and evenly, filter and then wait until bubbles disappear. |
2. The painted surface with PU, NC paint etc must be sanded completely to make it matte and then clean the sanding scrap. The application should be done evenly and do not apply too thick for one time. | |
3. If the wood has been applied solvent-based primer, then at least two weeks should be given to let it dry completely. | |
4. The wood surface must be dry, clean, strong and free of contaminants. Sand it with sanding paper (320#) in the same direction as wood grain. Fill the holes and cracks in the wood with transparent putty. | |
5. Apply 1-2 coats of putty on the treated wood. The recoat time is 2 hours and it is better to sand each coat with sand paper (400#). If the wood is very coarse, then more coats are suggested. | |
6. Dilute primer with 10-20% clean water and 2-3 coats are suggested. The recoat time is 3-4 hours and sand the first coat with sand paper (600#) and (800#) for the rest. | |
7. Dilute finish with 10-20% clean water and 2-3 coats are suggested. The recoat time is 4-5 hours and sand it lightly with sand paper (800-1000#). | |
Good Remind | 1. For better application experiences, please complement with other Maydos products. |
2. Application environmental condition (above 8°C and relative humidity below 85%). | |
3. The dilution water quantity varies from temperature and humidity. More water at low temperature and high humidity, and less at high temperature and low humidity. | |
4. Prevent the paint film from wetting and don’t put wet things on it before it is dry. Recoat time varies from the weather. | |
5. Under normal condition, the maintenance period of paint film is one week, but it should be longer in case of low humidity and thick paint film. |
Company Information
MIT-IVY INDUSTRY CO.,LTD is a manufacturer and exporter of fine chemical dyes & pharmaceutical intermediates in China.
Mainly produce aniline series products and chlorine series products.
MIT –IVY Chemicals Industry Co.,Ltd. is a leading manufacturerof chemical for 21 years with complete production equipment and meticulous management and maintenance of machinery.
We use advanced production technology and test methods to realize production, quality controlling to meet the standard. We have been approved by SGS, ISO9001, ISO140 01, GB/HS16949 and T28001.
Mit-Ivy main products include as the following:
API, pharmaceutical intermediates ,Dye intermediates, fine,speciality chemicals,Waterborne industrial paint and new energy materials.
Our main markets includes America, India, Africa, Indonesia, Turkey, South-east Asia, West Asia and so on. MIT-IVY Industry Main products shares 97% of the domestic market specializing in the production and management, We can supply the products with more competitive cost. with premium quality and price and welcome to consult. Our company has professional persons who major in chemical R&D and sicentific management, supply fine chemical products with high quality and close service, also supply custom-tailored products according to our clients’ requirement. We have a positive and self-motivated management work team with a common philosophy, caring and commitment through teamwork, our team strive to achieve success in delighting our clients and ourselves. we continuously innovate our products and improve our service, sales network. Hence, we initiate the first sale mode on net in China, which is the retail trade of small package bring along wholesale of diversified management modes. Our products are exported widely to South Korea, Vietnam, Australia, Europe and South America, highly recommended by our clients. We insist on the management creed “Market is our compass, Quality is our life, Credit is our soul”. Clients’ trust is our forward powder, their satisfaction is our struggling goal.
Brand Customer Service:
Our JIT customer service account team network in China develop and implement tailor-made concepts for the optimum supply of our customers with industrial and specialty chemicals.
Your advantages:
● Centralized customer service supports simplification of administrative procedures, resulting in time and cost saving.
● Our Chinese network and sophisticated logistics solutions ensure that chemicals of identical quality are supplied to customers with several manufacturing locations and contribute to security in planning and reliability of processes.
● Our processes are continuously optimized and adapted to our customers’ changing structures and requirements.
Superiority of Chemistry Logistics service:
Chemical logistic service is very professional and should be superior under UN regularity, especially for DGR Class series. We provide a special-purpose solution to optimize logistic and suitable packing group and labeling service for our principals. Our main Chinese ports with DGR chemical warehouses are to operate specialty chemical and apply all relative paperwork concerned.
Our distribution capabilities include:
● Flexible deliveries, intelligent solutions
● Anything from bulk shipments of thousands of tonnes down to the smallest shipment of packed goods and even samples.
● Bulk – storage and transport of powders and liquids – movement of goods in ships – powders and bulk liquids
● Pharma, feed and food storage to accredited standards
● Segregated materials by business unit and hazard classification
● Temperature controlled storage and transport
● Effective cost control
● Re-packing, drum filling, bagging, ripping and tipping
● Customer delivery KPI's on delivery fulfillment performance
If you are interested in getting more quotations,
please add WHATSAPP:0086-13805212761 or E-MAIL:info@mit-ivy.com
FAQ
Q. Are you factory or trading company?
A. We are a factory located in Fuan city, Fujian province, China .
Q. Are all colors are same price?
A.No, the price are different depend on the texture, availability, Ingredients and So on.
Q. Can you provide samples for quality checking before placing an order?
A. Samples are available upon request, but the shipping cost should be paid by customer.
Q. Is there a discount?
A. The discount will be given by the quantity.
Q. How about delivery time?
A. About 7-15 days after payment confirmed.
Q. What kind of payment terms you can accept?
A. We accept T/T, LC, Western Union and Paypal.
Product introduction
Key attributes
Industry-specific attributes
Other attributes
Packaging & delivery
Product Features:
2. The film is complete seamless and tenacity
3. Easy to clean, do not gather dust and bacteria
4. Smooth surface, water resistance
5. Oil resistance, chemical resistance
6. Anti slip performance, good adhesion, impact resistance, wear resistance
Color and appearance of paint film
|
Colors and smooth film
|
Dry film thickness, um
|
100-120
|
Drying time (25 ℃), H
|
surface dry≤4h, hard dry≤24h, Fully cured 7d
|
Adhesion (zoned method), class
|
≤1
|
Impact strength, kg, CM
|
≥50
|
Wear resistance (Mg, 750g/500r)
|
≤40
|
Water resistance
|
48 hrs, no blister, no fall off, no change color
|
Acid resistance
|
|
Alkali resistance
|
|
Hardness (swing rod method)
|
≥0.5
|
Solid Content
|
≥50%
|
Methods of application
The first step is to apply MyCover as a primer sealer so that later MySealant 2K, as a two-component water-based polyurethane varnish, creates the perfect protective film. You must wait 4 hours after the application of MyCover.
MySealant 2K is applied on the microcement coating in two layers and the drying time between layers is from 8 to 24 hours, depending on environmental conditions and taking into account that humidity delays drying. After the first layer, the surface should be sanded with a 400 grit sander, while the final layer does not require any sanding.
It should not be applied in environments with a temperature that is below 15ºC and for optimal results it is advisable to apply it at temperatures ranging between 18 and 24ºC. The polyurethane varnish can be applied with a fiber roller or gun.
Advantages
1.Very low VOC levels (Volatile Organic Compounds), being less aggresive to the environment and the painter
2.Provides highs resistance to corrosion with over 400 hours in salt spray and humid chamber tests
Construction description
Ingredients A, B two components
Mixing ratio 3:1 (weight ratio)
Mixing method: Mix component A thoroughly, add component B and continue mixing until smooth.
Coating thickness Dry film thickness 20 μ m
Wet film thickness 50 μ m
Maturing period (25℃) 10-15min
Service period (25°C) 3h
Re-coating interval 12h minimum 4Bh maximum
Maintenance
When directly applied on the surface of the primer, the primer shall be polished, clean, dry, free of rust and oil stains. When coated on the surface of the primer, the primer surface should be clean, dry and free of dirt.
Use conditions Construction temperature 10-35 ℃, mixing degree 30-75%, good ventilation conditions.
Notes
- Do not clean the surface with chemical products or cleaners that contain abrasive substances. The use of bleach and detergents is especially contraindicated.
- Clean the coating with water and MyCleaner or neutral soap
- Do not cover the microcement sealant until two weeks have passed since the application
- Before wetting it, it is necessary to let the polyurethane varnish dry for at least one week. Keep in mind that the fullness of its chemical properties is achieved after two weeks.
Recommended Paint System | 2 coats of Maydos transparent putty for patching imperfection |
1 coat of Maydos water-based wood varnish primer | |
2 coats of Maydos water-based wood finish | |
Clean up: Clean all equipment with clean water immediately after use | |
Storage:Store in cool(temperature range 5℃-45℃), dry and well-ventilated place and keep it out ofthe reach of children | |
Preparation and Application | 1. Before application, stir the paint completely and evenly, filter and then wait until bubbles disappear. |
2. The painted surface with PU, NC paint etc must be sanded completely to make it matte and then clean the sanding scrap. The application should be done evenly and do not apply too thick for one time. | |
3. If the wood has been applied solvent-based primer, then at least two weeks should be given to let it dry completely. | |
4. The wood surface must be dry, clean, strong and free of contaminants. Sand it with sanding paper (320#) in the same direction as wood grain. Fill the holes and cracks in the wood with transparent putty. | |
5. Apply 1-2 coats of putty on the treated wood. The recoat time is 2 hours and it is better to sand each coat with sand paper (400#). If the wood is very coarse, then more coats are suggested. | |
6. Dilute primer with 10-20% clean water and 2-3 coats are suggested. The recoat time is 3-4 hours and sand the first coat with sand paper (600#) and (800#) for the rest. | |
7. Dilute finish with 10-20% clean water and 2-3 coats are suggested. The recoat time is 4-5 hours and sand it lightly with sand paper (800-1000#). | |
Good Remind | 1. For better application experiences, please complement with other Maydos products. |
2. Application environmental condition (above 8°C and relative humidity below 85%). | |
3. The dilution water quantity varies from temperature and humidity. More water at low temperature and high humidity, and less at high temperature and low humidity. | |
4. Prevent the paint film from wetting and don’t put wet things on it before it is dry. Recoat time varies from the weather. | |
5. Under normal condition, the maintenance period of paint film is one week, but it should be longer in case of low humidity and thick paint film. |
Company Information
MIT-IVY INDUSTRY CO.,LTD is a manufacturer and exporter of fine chemical dyes & pharmaceutical intermediates in China.
Mainly produce aniline series products and chlorine series products.
MIT –IVY Chemicals Industry Co.,Ltd. is a leading manufacturerof chemical for 21 years with complete production equipment and meticulous management and maintenance of machinery.
We use advanced production technology and test methods to realize production, quality controlling to meet the standard. We have been approved by SGS, ISO9001, ISO140 01, GB/HS16949 and T28001.
Mit-Ivy main products include as the following:
API, pharmaceutical intermediates ,Dye intermediates, fine,speciality chemicals,Waterborne industrial paint and new energy materials.
Our main markets includes America, India, Africa, Indonesia, Turkey, South-east Asia, West Asia and so on. MIT-IVY Industry Main products shares 97% of the domestic market specializing in the production and management, We can supply the products with more competitive cost. with premium quality and price and welcome to consult. Our company has professional persons who major in chemical R&D and sicentific management, supply fine chemical products with high quality and close service, also supply custom-tailored products according to our clients’ requirement. We have a positive and self-motivated management work team with a common philosophy, caring and commitment through teamwork, our team strive to achieve success in delighting our clients and ourselves. we continuously innovate our products and improve our service, sales network. Hence, we initiate the first sale mode on net in China, which is the retail trade of small package bring along wholesale of diversified management modes. Our products are exported widely to South Korea, Vietnam, Australia, Europe and South America, highly recommended by our clients. We insist on the management creed “Market is our compass, Quality is our life, Credit is our soul”. Clients’ trust is our forward powder, their satisfaction is our struggling goal.
Brand Customer Service:
Our JIT customer service account team network in China develop and implement tailor-made concepts for the optimum supply of our customers with industrial and specialty chemicals.
Your advantages:
● Centralized customer service supports simplification of administrative procedures, resulting in time and cost saving.
● Our Chinese network and sophisticated logistics solutions ensure that chemicals of identical quality are supplied to customers with several manufacturing locations and contribute to security in planning and reliability of processes.
● Our processes are continuously optimized and adapted to our customers’ changing structures and requirements.
Superiority of Chemistry Logistics service:
Chemical logistic service is very professional and should be superior under UN regularity, especially for DGR Class series. We provide a special-purpose solution to optimize logistic and suitable packing group and labeling service for our principals. Our main Chinese ports with DGR chemical warehouses are to operate specialty chemical and apply all relative paperwork concerned.
Our distribution capabilities include:
● Flexible deliveries, intelligent solutions
● Anything from bulk shipments of thousands of tonnes down to the smallest shipment of packed goods and even samples.
● Bulk – storage and transport of powders and liquids – movement of goods in ships – powders and bulk liquids
● Pharma, feed and food storage to accredited standards
● Segregated materials by business unit and hazard classification
● Temperature controlled storage and transport
● Effective cost control
● Re-packing, drum filling, bagging, ripping and tipping
● Customer delivery KPI's on delivery fulfillment performance
If you are interested in getting more quotations,
please add WHATSAPP:0086-13805212761 or E-MAIL:info@mit-ivy.com
FAQ
Q. Are you factory or trading company?
A. We are a factory located in Fuan city, Fujian province, China .
Q. Are all colors are same price?
A.No, the price are different depend on the texture, availability, Ingredients and So on.
Q. Can you provide samples for quality checking before placing an order?
A. Samples are available upon request, but the shipping cost should be paid by customer.
Q. Is there a discount?
A. The discount will be given by the quantity.
Q. How about delivery time?
A. About 7-15 days after payment confirmed.
Q. What kind of payment terms you can accept?
A. We accept T/T, LC, Western Union and Paypal.