Product introduction
Two-component water-based epoxy intermediate paint.This product is made of water-based cycloammonia resin, water-based additives, mica iron oxide, environmentally friendly anti-lead vine filler, water-based epoxy curing agent, deionized water and other special processes. It is made of water-based dual group epoxy resin, mica iron oxide iron, amine curing agent, nano-functional material, anti-rust pigment, corrosion inhibitor and related additives. It's a non-solvent. Do not add chromium, lead and other heavy metal content high anti-rust pigment.The product is prepared by water-based epoxy resin, amine curing agent, mica iron oxide and related auxiliaries. The coating film has high salt spray resistance, and the product has high sealing property, which can effectively block the penetration of foreign media to the coating.
Recommended use
1. Make epoxy zinc-rich primer, inorganic zinc-rich primer and other high-performance anti-rust paint intermediate paint to enhance the interlayer adhesion and protection performance of the entire coating.
2. As the intermediate paint of acrylic polyurethane and other high decorative finish, to improve the fullness of the coating.
Product Application
Suitable for heavy anti-corrosion field of metal coating, anti-corrosion and rust prevention of large steel structures, Bridges, ships, tower cranes, storage tanks with higher anti-corrosion requirements, and high-performance primer and top paint used together, can further improve the anti-corrosion performance.
Details
Technical parameters Color: gray
Solid content: 60±2%
Mitsuze: No light
Drying time (25 ° C) : table dry for 1 hour
24 hours of hard work
Fully cured for 7 days
Drying (70-80℃) : 2 hours of work
Film hardness
Film adhesion: 1 level
Film flexibility: 2mm
Film impact resistance: 50cm.kg
Theoretical coating rate: 8m'/kg (dry film 40μm)
Construction method: Ratio A component: B component = 9:1
Construction method: air spraying/airless spraying
Diluent: clean water
Dilution: 5-15%
Nozzle diameter: 1.5-2.5mm
Spraying pressure: 0.4-0.6Mpa
Application period: 3h "Under the condition of 20℃)
Coating matching: Select matching system according to requirements.
This product is not recommended for use alone, and can be used in conjunction with most of our water-based or solvent-based primers and topcoats.
Packing specification: A component: 18kg/ barrel B component: 2kg/ barrel
The construction environment and other explanatory data are the same as "H602 water-based epoxy primer", please refer to.
Safety data
This product is water-based environmental protection paint, low carbon environmental protection, no burning, no explosion
Main characteristics
1. Extremely low VOC, water as diluent, green environmental protection.
2. Non-flammable and explosive products, can be transported as non-dangerous goods, safe and reliable.
3. Excellent adhesion with primer, tight film, strong sealing performance.
4. Excellent physical and mechanical properties after drying, and can be matched with all kinds of paint.
5.High salt spray resistance, excellent anti-corrosion properties, tough and dense film, and the primer has good adhesion.
6.The product has a high sealing property, which can effectively prevent the penetration of foreign media to the coating; A film formation can reach 80-120 microns. Suitable for use as intermediate paint.
Advantages
1.Longer paint intervals
2.Excellent water and salt water resistance
3.The film is tough, strong and wear-resistant
4.Thick paste heavy anticorrosive paint
5.Good compatibility with a variety of subsequent coatings
Construction description
1. Clean the oil, rust, old patent leather and other dirt on the surface of the substrate before painting to ensure that the surface of the substrate is clean and dry.
2. Grinding wheel is used to remove welding bumps, spatter, and hardened layer on the workpiece surface. All free edge acute angles after gas cutting, shearing or machining should be polished to R2.
3. Sand blasting to Sa2.5 level or power tool cleaning to St2 level, construction within 6 hours after sand blasting.
4. Brush painting and spraying can be used for construction, and the paint should be stirred evenly before painting. If the viscosity is high, an appropriate amount of deionized water can be added, and the amount of water added should not exceed 10%, and it should be stirred while adding to ensure that the paint is uniform.
5. Maintain good ventilation during construction, and do not recommend construction when the ambient temperature is lower than 5 ° C or the humidity is greater than 85%.
6. Rain, snow and fog weather can not be constructed outdoors, such as construction, can be taken to protect the paint film by covering it with tarpaulin.
Storage and transportation
1. The product should be sealed and stored in a dry and well-ventilated warehouse with a storage temperature above 5 ° C and below 35 ° C to prevent direct exposure to water and sunlight, isolate the fire source, and stay away from the heat source.
2. If the product meets the storage conditions, the storage period is one year from the date of production, and the storage period can be tested beyond the storage period. If it meets the standards, it can still be used.
3. During the transportation process, the product should be prevented from cold, rain and sunlight exposure, and should comply with the relevant provisions of the transportation department.
Surface treatment
1. All surfaces to be coated shall be clean, dry and non-polluting, and all surfaces shall be evaluated and treated according to ISO8504:1992.
2. Grease shall be removed according to the requirements of the SSPC-SPI solvent cleaning standard.
3. Use the sandblasting cleaning method to make the surface meet the above standards. If oxidation occurs during the period from sandblasting to painting, the surface should be sandblasted again to meet the specified visual standards.
Notes
1. Stir well before use:
2. Using high-pressure airless spraying method, 0-10% water can be added according to different ambient temperatures
3. Polish the primer or remove dust and other debris before painting.
FAQ
Q. Are you factory or trading company?
A. We are a factory located in Fuan city, Fujian province, China .
Q. Are all colors are same price?
A.No, the price are different depend on the texture, availability, Ingredients and So on.
Q. Can you provide samples for quality checking before placing an order?
A. Samples are available upon request, but the shipping cost should be paid by customer.
Q. Is there a discount?
A. The discount will be given by the quantity.
Q. How about delivery time?
A. About 7-15 days after payment confirmed.
Q. What kind of payment terms you can accept?
A. We accept T/T, LC, Western Union and Paypal.